Revision list 2021.10.28 - Changed the front elevation from the C elevation to the B elevation 2021-10.12 - So this lot was never finished 100%, I think we stopped when there was zoning issues and we reduced the width and depth by a few inches. I have added exterior dimensions so we can plot the house on the lot and determine if the proposed design complies zoning. 2021.10.12 - fixed the PDFs to show the correct house (Ie. not maple ave) 2021.10.22 - Issued to consultants 2021.10.22 - Grading plan uploaded 2021.10.22 - Zoning sheets